From Your Drawings to a Tested Panel on Site

Six steps, the same on every job, whether it is a single distribution board or a full MCC line-up.

Production area

Our Process

1

Design Review

We start from your consultant’s approved drawings and specification and go through them before anything is ordered. If something needs clarifying, we ask.

2

Component Selection

We source the components your specification names, from the manufacturers your project requires or approved alternatives.

3

Assembly

Busbar fabrication and fitting, wiring and component mounting, carried out by trained technicians.

4

Inspection and Testing

Every panel is inspected during assembly and tested before release. Nothing leaves untested.

5

Final Inspection

A last check of the finished panel against the approved drawings, before it is cleared for dispatch.

6

Delivery

Delivered to site, ready for your installation contractor.

Quality and Testing

We check as we build, not only at the end. Testing is carried out to your project specification, and you or your consultant are welcome to witness it before the panel is released.

  1. 1Component inspection
  2. 2In-process inspection
  3. 3Functional testing
  4. 4Electrical testing
  5. 5Factory Acceptance Test (FAT)
Finished panel ready for testing

What We Check

Check What it confirms
Insulation resistance Insulation between conductors and to earth is sound
Dielectric withstand The assembly withstands its test voltage
Continuity and earthing Connections and protective earth are complete
Operational sequence Controls, interlocks and changeovers work as designed
Factory Acceptance Test The panel matches the approved design before release

Indicative checks. The test scope is set by each project's specification.

Drawings

We build to your consultant's approved design. GA drawings are available on request.

Warranty and Repair

Product warranty according to the components supplied, and repair service when you need it.